Call us today on +44 (0)1228 522255

CASE STUDIES

RECOMMENDED PRODUCT ENBAC® B220

RECOMMENDED PRODUCT ENBAC® B220

FOOD AND DRINK – FOOD PROCESSING

Smokery

 
This popular fish smokehouse, situated by the seaside, has a pre-treatment plant leading to a sewage treatment plant.

The Problem

The fats, oils and greases (FOG) from cleaning, preparing and smoking the fish was accumulating excessively in the sewage pre-treatment plant. Even worse, the wastewater could not easily flow from the pre-treatment plant to the main sewage treatment plant because the connecting pipeline was blocked with hard fat. The fat had been removed physically, but this solution was effective only for a short time. It soon built up again.

In effect, the fish smokehouse could not work properly.

The Solution

Our Distributor’s recommendation was to dose EnBac® B220 into the pre-treatment plant. The solid FOG was physically removed from the blocked pipeline.

The Results

After a short period of regular dosing, the whole problem with FOG has vanished. The pre-treatment plant is now free from build-ups of FOG and the connecting pipeline also runs clear. Our Distributor says his client is content and business in the fish smokehouse carries on.

To avoid this situation recurring in the future, our Distributor has recommended using EnBac® B220 in the pre-treatment plant on a regular basis